Chalet Build
Stairs
Finishing touches still to do
First railing almost done
Stairs
Getting ready for the treads
Stairs
Stairs
Stairs
Morning bedroom view
Splitting
Wood stacked
Starting the stairs
Railing going up
Deck is finished - just need a step
My hole jig
Deck - almost done
Higher than expected - will need a rail :(
Helpers
Deck - starting to add boards - more bracing to come
Deck started
Screen Porch (getting it done before the arrival)
Screen porch done!
Tapped
Boiling sap...
Sunset hike - looking down on chalet
Winter day
P installing tile
P installing backsplash
Backsplash finished
Started the bunk beds
Bunk beds
Bunk beds
Bunk beds finished
End table finished
Back porch
Pantry door is hung
Pantry doorjam & shelves
Pantry
P made a nice night table
New steps
Need new steps
Wood piled
Wood for Winter
Fall colours
Slowly adding the amenities
Bathroom is pretty much done
We finally finished the shower!
Forest green
Winter is coming
First fire in the wood stove
Fall colours from my morning coffee spot
Almost half the rock spread
Island finished
Island with flowers
Crushed rock delivery
Island in process
Island counter in progress
Missing 100 ft2 of siding and my temporary door
Siding is done
Siding is done
Foggy Morning
Foggy morning, view from the road
Island
Siding
Siding - bit more than half done
Plumbing dry run
Siding - we decided not to do it ourselves
Starting the kitchen
Back porch
Thunder in the distance
Door hung - just needs a knob
Finally a bed that is not blown up
Unpacked
Girls room - built-in bunk beds in the future
Table
Couch is unpacked
Making door jams from scratch is a long process
Pine flooring is varnished
Mezzannine flooring
View from the road at night
Hallelujah, running water and a toilet.
A chair, a light and a stove
A lot of activity on the back porch
I started the mezzanine flooring this weekend - knotty pine
Siding shipment arrived on Friday
Went to Gatineau today to pick up our flooring and door order
Work bench
Vacation work - got some temp railings in
Vacation work - trim started
Vacation work - painting trim
From back porch looking south
Mudroom/entry
Entry looking to porch (door on back order)
I need to put up a temporary railing
Stairs & two windows
Evening light in main room
Black doors
Unprotected floor texture from weather and scrapes
No cell service but satellite internet
Rough stairs without railing
Looking down from mezzanine
Girls in girls' room
Study area
Kitchen window
Bathroom
Stairs, pantry & utilities (water pump to come)
Drywall is on
Drywall is on
Mezzanine with interior walls
View from the lower firepit
Cleaning around the cabin
Porch structure is in
Stairs
East side
Supper in our porch
Master bedroom
Windows!
Field is growing well
Front & side patio doors
Bathroom in the corner, door to porch
View from girls room
View from our room
Construction
Cabin
Girls' room
Our room
Looking east
Living area
Back
Front
Front
Front
Grass and wild flowers seeding is coming in
View from north side, by stream
Main beam (from mezzanine)
Looking down from mezzanine
View from kitchen area
Walls ready to go up
West wall - window in staircase
Wall construction
May 30
Back door leading to screened in porch
Front area (completed wall on left)
Front
Slab is poured
Site plan
3D render - south
3D render - east
Plans - west elevation
Getting the septic field/mound ready for seeding
Ready for slab pour | in-floor heating wired
Foundation - ready for pour [on May 18th fingers crossed]
Foundation
Septic field finished
Septic tank covered
Rough plumbing started & sonotubes for porch under the black bags
Rough plumbing started
Drive retaining rocks installed
Drive
Septic tank
Septic field (larger than we thought)
Snow is melting and the lot is a bit of a mess - lots of work to do
Plans - been on our coffee table for quite some time!
Backfill done, water & sewer lines added
Backfill done
Cabin - March 13
Drive looking towards chemin Jackson
Foundation from front - facing north
One of the wood piles
Foundation - footing for post
Looking towards stream
Foundation - looking north
Cabin
Cabin
Foundation footings poured (under insulating blankets)
Foundation footings - 2 corners are sitting on bedrock
Footings - this edge sitting on bedrock
Foundation footings
After the blasting
Cabin area
Drilling for dynamite
Dynamite machine
Explosives
Boom
Dynamite
Dynamite machine (video)
Digging the drive (video)
Cabin clearing (video)
Excavation of the foundation (video)
Dynamiting pads
Prepping for foundation work
Cabin clearing
Chemin and skiing
Excavation
Excavation
Resized_20201203_1440401
Resized_20201203_1440491
Resized_20201203_1440521
View from cabin (tape shows front and west walls)
Scrapping topsoil
Chemin
View from cabin towards road
Peaceful stream
Lots of earth to move to get the required slope
First of many trips
Chemin
Lot topography
Possible path of drive from road (video)
Chalet location (video)
Looking up to chalet spot (from East)
Emplacement du chalet
Possible chemin
View from road
Test du sol
Test du sol
Test du sol
Test du sol